IT & TELECOM / SOFCON AZERBAIJAN

xFusion AI servers

Build the accelerator configuration around training, inference and application software. G6550/G8550 V8 and the V7 GPU systems differ in chassis, processor platform and accelerator topology.

Prepare an enquiry
FusionServer G8550 V8 AI server
SOFCON AZERBAIJANRequirements / solution / delivery
xFusion · Explore the brand

Models and platforms

ModelApplicationsKey features
G6550 V8Manufacturer details ↗Accelerated compute: select the GPU and software together.
  • 6U rack format
  • 2 × AMD EPYC 9005
  • 10 GPU positions in the documented configuration
G8550 V8Manufacturer details ↗Accelerated compute: select the GPU and software together.
  • 10U rack format
  • 2 × AMD EPYC 9005
  • 16 GPU positions in the documented configuration
G5200 V7Manufacturer details ↗Accelerated compute: select the GPU and software together.
  • 4U rack format
  • 4th/5th Gen Intel Xeon Scalable platform
  • 32 DDR5 memory slots
G5500 V7Manufacturer details ↗Accelerated compute: select the GPU and software together.
  • 4U rack format
  • 4th/5th Gen Intel Xeon Scalable platform
  • 32 DDR5 memory slots
G8600 V7Manufacturer details ↗Accelerated compute: select the GPU and software together.
  • 8U rack format
  • 4th/5th Gen Intel Xeon Scalable platform
  • 32 DDR5 memory slots

Selection guides

Prepare an enquiry
IT & Telecom

From requirements to delivery

01

Cards, modules and software

G6550 V8 provides ten dual-width GPU positions in 6U; G8550 V8 documents sixteen GPUs in 10U. Confirm the actual accelerator model, interconnect and software stack before selecting the system. GPU count alone does not establish application throughput.

02

Rack and facility readiness

Check rack depth, weight, power feeds, airflow and service clearance alongside network bandwidth and storage. A multi-server training deployment also needs an agreed network topology and failure-recovery test.

03

Validate with your workload

Define model precision, concurrency, latency, batch size and data movement for the pilot. As of 7 November 2026, G5200 V7 EOM is scheduled for 31 January 2027; G5500/G8600 V7 for 31 March 2027. Include that horizon in expansion planning.

Send the intended workload and configuration so we can define supply, integration and support scope.

SOFCON AZERBAIJAN

Let’s work through your IT requirements.

Infrastructure, integration or software: start with the objective and the current situation.

Prepare an enquiry