Reconciling an xFusion rack, power and cooling design
Match the exact server, FusionPoD revision, power shelf and facility loop before committing a rack-scale configuration.
ExploreSelect the rack system, compute nodes and liquid-cooling interfaces as one engineered configuration. FusionPoD, FusionPoD for AI and individual DH/GN nodes have distinct roles and revision boundaries.
Prepare an enquiry
| Model | Applications | Key features |
|---|---|---|
| FusionPoDManufacturer details ↗ | Whole-rack liquid-cooled infrastructure. |
|
| FusionPoD for AIManufacturer details ↗ | Rack-scale AI system with revision-specific power and cooling. |
|
| DH120E V8Manufacturer details ↗ | Cold-plate compute node for a specified rack design. |
|
| DH120E V7Manufacturer details ↗ | Liquid-cooled node selected by generation and rack compatibility. |
|
| DH122E V6Manufacturer details ↗ | Liquid-cooled node selected by generation and rack compatibility. |
|
| FusionPoD 600Manufacturer details ↗ | Identify the installed version before planning support or integration. |
|
| GN560E V7Manufacturer details ↗ | Identify the installed version before planning support or integration. |
|
| FusionServer CDUManufacturer details ↗ | Cooling distribution interface between IT equipment and the facility. |
|
Match the exact server, FusionPoD revision, power shelf and facility loop before committing a rack-scale configuration.
ExploreIdentify models and CPU variants, distinguish EOM from EOS, and build a staged migration for existing rack, blade and mission-critical systems.
ExploreA complete FusionPoD rack is different from a DH120E node. Freeze the rack revision, supported node list, firmware and power shelf before combining specifications. DH120E V8 is a 1U cold-plate node with dual Xeon 6 processors and 24 memory slots.
Define CDU duty, coolant quality, temperature, flow, pressure and facility heat rejection. The selected 2025 FusionPoD for AI guide describes a 105 kW rack and 51 kW N+1 shelf; those values belong to that documented revision.
Agree isolation, leak checks, alarm integration, node replacement and recovery tests. Supply scope can cover the rack, node configuration and integration brief; site works and operating responsibilities should be explicit.
Send the intended workload and configuration so we can define supply, integration and support scope.
Infrastructure, integration or software: start with the objective and the current situation.
Prepare an enquiry