03 / MARINE

Supply for vessels and marine facilities.

Equipment and components for vessels and marine infrastructure. Supply packages shaped by technical requirements, operating conditions and the delivery schedule.

Prepare an enquiry
SOFCON AZERBAIJANRequirements / solution / delivery
In practice
ASCOASCO: marine engine and systems supply
The supply scope

Vessel systems. The maintenance schedule.

Main and auxiliary system equipment follows the vessel configuration. The repair package, port handover and technical work are scoped separately.

01

Engines & spares

Main and auxiliary engines, spare parts and system components. Selection follows the engine model, serial number and installed configuration.

Scope of work
  • Main and auxiliary engines
  • Components and repair kits
  • Selection by model and serial number
02

Engine overhaul

Coordination of engine overhaul: condition assessment, work scope, spare parts, testing and documentation. The executor, work location and schedule are agreed for the project.

Scope of work
  • Condition assessment and repair work list
  • Spare parts packages for overhaul
  • Testing, documentation and provider agreement
03

Maritime supply

Filters, pumps, valves, hydraulics, electrical components and maintenance materials. Handover is coordinated around the vessel, port, agent and dry-dock schedule.

Scope of work
  • Filters, pumps, valves and hydraulics
  • Electrical equipment and maintenance materials
  • Port handover around the agent and dry-dock schedule

Project deliverables

  • Package matched to vessel equipment and configuration
  • Repair work list and documentation requirements
  • Handover plan around port and dry-dock schedules
TECHNICAL / COMMERCIAL / LOGISTICS

What the vessel specification must define.

Alongside the part code, identify the vessel, engine serial number, documents and handover point. Agree the executor and scope of installation or repair work separately.

01

Equipment identification

Vessel name, engine model and serial number, OEM part code or drawing.

02

Documents & approvals

Datasheets, origin and any class documents required for the application. Agree substitutions against the vessel owner’s requirements.

03

Handover point & window

Port, agent details, dry-dock date and acceptance procedure. Confirm timing after checking availability and logistics.

Delivery stages

Every supply stage. One coordinated process.

Specifications, procurement, documentation and logistics coordinated around the project requirements.

How it worksOne enquiry, three checks
Technical

Code, compatibility, documents

Commercial

Quantity, price, contract

Logistics

Packaging, timing, delivery

01

Technical brief

Project phase, specification and required delivery schedule.

02

Supplier sourcing

Suitable sourcing options and comparison of proposals.

03

Scope & terms

Supply scope, documentation and commercial terms.

04

Order coordination

Coordination of order items and readiness stages.

05

Logistics

Consolidation and the agreed delivery plan.

06

Handover

Completeness and accompanying documentation review.

Equipment coverage

Equipment

Main and auxiliary engines, spares, filters, pumps, valves and electrical components. Navigation and communications equipment also requires interface and installed-system compatibility checks.

Equipment coverage
Procurement & logistics

What the proposal needs to specify.

Compare proposals by scope, exclusions, documentation and conditions as well as price.

Scope & exclusions

Model, quantity, item condition and excluded work. Identify alternatives separately.

Terms & timing

Currency, payment, quote validity, delivery location and the parties’ responsibilities.

Acceptance & warranty

Acceptance criteria, documents, warranty scope and the process for reporting discrepancies.

PROJECT / STARTING POINT

Project requirements

Include the objective, equipment or services, location and timeframe. Without a specification, describe known requirements and constraints.

  • Vessel, equipment model, serial number and part codes
  • Repair work list, quantities and required documents
  • Port, agent, handover point and required date
Prepare an enquiry
Before the project

Key questions. A clear starting point.

01What information is needed for marine equipment?

Vessel and equipment details, model and part code, operating conditions, mounting dimensions and required documentation.

02Can the schedule follow a port or dry-dock window?

Specify the handover location and service window in the brief. Agree a feasible schedule after reviewing availability and logistics.

SOFCON AZERBAIJAN

Let’s plan the supply for your next project.

Discuss a supply and delivery plan around your specification, project phase or IT brief.

Prepare an enquiry