Project procurement
Equipment packages for construction, modernisation and technical upgrades, with specifications and phased delivery matched to the project plan.
From individual equipment items to complete supply packages, matched to the project phase, technical requirements and delivery schedule.
Prepare an enquiry
Packages for new projects, operations and procurement follow the technical brief and delivery milestones.
Equipment packages for construction, modernisation and technical upgrades, with specifications and phased delivery matched to the project plan.
Spare parts, components and materials for installed equipment, covering daily operations and planned maintenance.
Supplier sourcing, proposal comparison, order consolidation and delivery planning, with terms and documentation agreed in advance.
Each enquiry defines the application, technical documents and delivery terms for oil and gas, metallurgy or manufacturing.
Project and MRO packages for rotating equipment, piping systems and control components. Operating medium and equipment identification guide the scope.
Parts and component enquiries for furnaces, rolling, casting, welding and cutting equipment. Identify the model, drawings and technical requirements.
Metals, alloys and industrial raw materials. Specify grade or composition, form, dimensions, volume and quality documents; sourcing availability is checked for each product.
Alternatives, documents and delivery terms are agreed before ordering.
Model, application and compatibility with the installed system. Alternatives require separate agreement.
Required datasheets, certificates and origin documents are identified in the specification.
Milestones, consolidation, destination and handover terms are agreed in the proposal.
Specifications, procurement, documentation and logistics coordinated around the project requirements.
Code, compatibility, documents
Quantity, price, contract
Packaging, timing, delivery
Project phase, specification and required delivery schedule.
Suitable sourcing options and comparison of proposals.
Supply scope, documentation and commercial terms.
Coordination of order items and readiness stages.
Consolidation and the agreed delivery plan.
Completeness and accompanying documentation review.
Equipment groups guide initial selection. The technical brief defines the final package.
Equipment coverageCompare proposals by scope, exclusions, documentation and conditions as well as price.
Model, quantity, item condition and excluded work. Identify alternatives separately.
Currency, payment, quote validity, delivery location and the parties’ responsibilities.
Acceptance criteria, documents, warranty scope and the process for reporting discrepancies.
Include the objective, equipment or services, location and timeframe. Without a specification, describe known requirements and constraints.


Sofcon supplied, installed and commissioned a tomato-processing line for UNDP.
An equipment schedule, technical parameters, quantities, destination and required timeframe. If requirements are incomplete, describe the project phase and known constraints.
Compare alternatives by technical parameters, materials, interfaces and required documentation. Agree substitutions separately before ordering.
Consider equipment availability, consolidation, documentation and logistics milestones. Agree the confirmed schedule and handover terms in the proposal.
Discuss a supply and delivery plan around your specification, project phase or IT brief.
Prepare an enquiry