05 / IT & TELECOM / 02

System integration

We design and integrate networks, servers and applications, with migration and acceptance testing planned in advance.

Prepare an enquiry
SOFCON AZERBAIJANRequirements / solution / delivery
In practice
Huawei OceanStor Dorado 3000 V6
Irshad TelecomHuawei Dorado for Irshad Telecom: from design to acceptance
Azercell TelekomTelecom engineering infrastructure supply for Azercell
Scope of work

What the service covers

  • 01

    Infrastructure assessment and design

    Review installed equipment, system dependencies and constraints. Agree the target architecture and project boundaries during design.

  • 02

    LAN/WAN, Wi-Fi and server infrastructure

    Plan network topology, segments, wireless coverage and server resources around the business workload.

  • 03

    System connections, migration and testing

    Define migration order, service windows and rollback procedures. Prepare functional tests and handover documentation.

Project deliverable

A tested system, documentation and handover.

HUAWEI / XCITIUM / AI

Infrastructure, security and automation

Sofcons is an official Huawei and Xcitium distributor in Azerbaijan. We connect product selection with integration, software development and technical support.

Delivery stages

Integration, testing and operational handover.

Acceptance tests check functions and system connections. Configuration, migration results and operating documents are handed over to the team.

01

Assessment

Equipment, system dependencies and constraints.

02

Design

Architecture, work scope and migration plan.

03

Integration

Configuration and changes within the agreed window.

04

Testing & handover

Acceptance tests, results and operating documentation.

Agreed deliverables
  • System architecture and configuration records
  • Acceptance tests and recorded results
  • Operating procedures and team handover

Related expertise

Before the project

Key questions. A clear starting point.

01How is downtime planned during migration?

Identify dependencies and critical services; agree testing, a maintenance window and a rollback plan. Define downtime after assessing the project.

SOFCON AZERBAIJAN

Let’s work through your IT requirements.

Infrastructure, integration or software: start with the objective and the current situation.

Prepare an enquiry