Assessment
Equipment, system dependencies and constraints.
We design and integrate networks, servers and applications, with migration and acceptance testing planned in advance.
Prepare an enquiry
Review installed equipment, system dependencies and constraints. Agree the target architecture and project boundaries during design.
Plan network topology, segments, wireless coverage and server resources around the business workload.
Define migration order, service windows and rollback procedures. Prepare functional tests and handover documentation.
Sofcons is an official Huawei and Xcitium distributor in Azerbaijan. We connect product selection with integration, software development and technical support.
Acceptance tests check functions and system connections. Configuration, migration results and operating documents are handed over to the team.
Equipment, system dependencies and constraints.
Architecture, work scope and migration plan.
Configuration and changes within the agreed window.
Acceptance tests, results and operating documentation.
Identify dependencies and critical services; agree testing, a maintenance window and a rollback plan. Define downtime after assessing the project.
Infrastructure, integration or software: start with the objective and the current situation.
Prepare an enquiry