Reconciling an xFusion rack, power and cooling design
Match the exact server, FusionPoD revision, power shelf and facility loop before committing a rack-scale configuration.
ExploreFusionWatt modules and power shelves are selected by electrical class, mechanical fit and host-system compatibility. Build a documented power configuration for the actual server or rack.
Prepare an enquiry
| Model | Applications | Key features |
|---|---|---|
| FusionWatt PSUs / FusionWatt Platinum CRPSManufacturer details ↗ | Server-power family selection by module class. |
|
| PAC900S12-B2 / PAC1500S12-B1 / PAC2000S12-B1 / PAC900S12-T1 / PAC2000S12-T1 / XA3000Manufacturer details ↗ | Power modules grouped for electrical and mechanical selection. |
|
| PDC1200S12-CF / PHD1500S12-B2Manufacturer details ↗ | Power modules grouped for electrical and mechanical selection. |
|
| CRPS1K3S12-P / CRPS1K6S12-P / CA2000Manufacturer details ↗ | Power modules grouped for electrical and mechanical selection. |
|
| PDP3000S54-T1 / PS330 / PS260 / PS350Manufacturer details ↗ | Power-shelf systems: specify the exact model and module population. |
|
| FusionWatt 94Manufacturer details ↗ | Identify the installed version before planning support or integration. |
|
Match the exact server, FusionPoD revision, power shelf and facility loop before committing a rack-scale configuration.
ExploreAC, −48 V DC and high-voltage DC inputs are different electrical classes. Confirm nominal output rail, derating, connector and host approval. A similar wattage or model suffix does not establish interchangeability.
The 68 mm family, CRPS modules and power shelves have distinct mechanical and system interfaces. Specify the full product designation, host part number and shelf revision. PAC900S12-T1, XA3000 and PDP3000S54-T1 should be selected against their own electrical and mechanical documentation.
Size the rack against the agreed redundancy state and available feeds. Record installed modules, shelf revision, monitoring and replacement procedure; nameplate totals alone do not define resilient capacity.
Send the intended workload and configuration so we can define supply, integration and support scope.
Infrastructure, integration or software: start with the objective and the current situation.